Search
View: 715|Reply: 0
Print Prev. thread Next thread

run on to the underside of horizontal

[ Promote this link! ]

1763

!threads!

0

Friends

6021

Money

member

Rank: 1

Jump to specified page
1#
Post time 2019-11-6 12:10:21 |Show the author posts only |Descending
outcome. The siding should be placed at least 4?to 8?above grade to protect the system and structure from moisture damage. Visual inspection should reveal seeing some of the foundation above grade and below the siding. Foundations are designed to withstand moisture in the soil. People may not like the appearance of exposed foundation, but from a  " how sturdy are pallet fences , shallow laminate loft railings dimensions "functional standpoint it is necessary. Siding materials placed too close to the roof surfaces will also keep the materials constantly wet. Siding materials should be kept a minimum of one to two inches above the roof surface. Planters and gardens should not be built against the home or structure. A raised planter with three sides and the building acting as the fourth side is a poor arrangement. Siding materials are not designed to be in contact the earth. Having planters against the structure can have grave implications for the buildings. Raised planters close to the building should have four sides and should be set out at least two inches from the siding. This is not a common detail, but it is a lot easier on the  " attach wooden fencing to concrete wall , thick acrylic panels malaysia 1200mm length "
You have to log in before you can reply Login | 立即注册

Heyshell

2024-11-1 07:18 GMT+8 , Processed in 0.041252 second(s), 20 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

To Top