Search
View: 810|Reply: 0
Print Prev. thread Next thread

floor in the domestic market

[ Promote this link! ]

1763

!threads!

0

Friends

6021

Money

member

Rank: 1

Jump to specified page
1#
Post time 2018-7-3 20:28:11 |Show the author posts only |Descending
material crisis!' Yesterday, Guo Hui,hardwood floor finishes satin or gloss vice president of the company, was shocking. According to reports, since the beginning of this year, the prices of raw materials for solid wood flooring have generally increased by 5%-10%, up to 20%. Many small and medium-sized enterprises have stopped production because raw materials cannot be put in place,wallpaper wooden design panel in dubai and some irresponsible small enterprises have shoddy Other means disrupt the market.
However, Guo Hui told reporters that the impact on the iconography was not too great, because the icon set up its own fast-growing forest base as early as two years ago. building a floating deck on a flat roofIt is understood that most fast-growing forests use rotary cutting, with an average of 5 years as a rotation period, and generally there can be 3 rotations.Non Slip Wood Wall Panel Decor The investment of one mu of fast-growing forest requires about 500 yuan, which means that an acre of forest land
built on the basis of 500 yuan can be used three times.mega star pvc toll free no Compared with long-term imports of foreign raw materials or plates, investing in fast-growing forests will undoubtedly have more long-term economic benefits. Industry insiders analyzed that the move of the fast-growing forest to the upper reaches of the industrial chain not only prevents the iconostasis from being passive in terms of quality, price, etc.,amish wood composite sandboxes which may be caused by
You have to log in before you can reply Login | 立即注册

Heyshell

2024-9-20 05:58 GMT+8 , Processed in 0.037734 second(s), 21 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

To Top