Search
View: 943|Reply: 0
Print Prev. thread Next thread

Guide Rails For mold

[ Promote this link! ]

10

!threads!

0

Friends

34

Money

member

Rank: 1

Jump to specified page
1#
Post time 2018-3-27 13:55:28 |Show the author posts only |Descending

Our History
Taiyou was a small workshop in 2009, and started with standard components and simple wire cuttings services, now we’ve grown up to a fully armed factory with all the state-of-the-art fabrication facilities, complex and precision die mold parts, even complete cavity machining are becoming our major jobs.
Our Factory
Taiyou is good at manufacturing of complex custom components for mold and die industries, such as mold cavity inserts, cores pins, slides, wear plates, die blanks, punches and dies, die inserts, as well as precision parts for gauges, jig, fixtures and other precision tooling or machinery. The technical involves are Wire EDM cutting, CNC machining milling, CNC lathe, cylinder and surface grinding.
Capabilities include custom parts with diameters ranging from 0.2 to 220  mm and tolerances down to 0.002mm, lengths up to 600mm, surface finishes as best as Ra0.2.
We would welcome the opportunity to earn your trust and deliver you the best service in the industry. Once you try us, you will never regret.
Our Product
precision die mold machining, including cavity inserts and core pins ,slides, punches and dies, die inserts, die blanks, as well as other precision parts of automation, fixtures, medical tooling, machinery.
Product Application
Used in Plastic molds, stamping dies, casting dies, automation system, fixtures, special gauges, medical tooling, and machinery.
Our Certificate
ISO9001:2015
Production Equipment
Wire EDM,
Sinker EDM,
CNC machining center,
CNC lathe,
Surface grinder,
Cylinder grinder,
Centerless grinder,
Production Market
Our major market was Asia but now the business has expanded greatly to Northern Europe and Americans. Now more than half of our precision parts are fabricated for overseas market.
Our service
When a new project comes, we study carefully and quote reasonable price within 1-7 days. Our staff works closely with our customers' engineers providing assistance to assure the successful completion of all projects from concept to component fabrication. Lead time is usually 2~3 weeks and progress will be reported to customer every week with photos until it is done. Quality is assured by our quality control system, advanced facilities and skilled technicians, even there are problems pop up after delivery, we will make sure everything is solved with satisfaction. Shipment can also be taken care of by us to save customers time and energy.
Testing Equipment
  
Production Equipment
  
  
  Guide Rails For mold
website:http://www.taiyoutooling.com/

You have to log in before you can reply Login | 立即注册

Heyshell

2024-12-22 21:04 GMT+8 , Processed in 0.037054 second(s), 20 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

To Top